|
Ken's
Home Radio Excel Calendar with
World Clock excelfan.com
The 3-Month Vertical Calendar, designed to show the 3 months,
starting with either the current month (enter "=TODAY()" in B1 cell), or
any month (enter "2001/7" in B1 cell) followed by the next 2 months,
is posted. The "Year" sheet is used to enter data for the day.
Here is the file to download.
- February 26, 2001 -
Copyright (C) Ken Matsuoka
|
|